Search scope:
排序: Display mode:
Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui
Strategic Study of CAE 2001, Volume 3, Issue 8, Pages 58-63
For a hydropower project, river diversion planning directly decides the dam construction and has aThe relations between selection of diversion standard and investment, construction duration, risk andThis paper systematically analyzes the controlling factors of choosing diversion standard during initialstage construction is established.construction.
Keywords: construction diversion initial stage of construction diversion standard of construction diversion multi-objective
The South-to-North Water Diversion Project
Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC
Engineering 2016, Volume 2, Issue 3, Pages 265-267 doi: 10.1016/J.ENG.2016.03.022
Hu Lianxing,Tong Dawei,Jiao Kai
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 97-102
Long diversion tunnel is often featured by great embedded depth, long, leading to the deviation between formerly construction schedule plan and actual construction scheduleIf the deviation isn't corrected timely, the formerly plan can not guide the actual construction.process real-time schedule control and visual analysis of the long distance diversion tunnel based onThe feasibility study and scientific basis is provided for the real-time control of construction schedule
Keywords: long diversion tunnel construction schedule real-time control visual simulation
Wu Shouchang, Xu Yingmei
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 8-13
Keywords: Sutong Bridge project plan special research subjects
The construction design and practice of Three Gorges Project
Wen Yonghong,Xie Xiangrong,Fan Wuyi
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 111-116
Keywords: Three Gorges Project construction diversion earth rock concrete
Insurance ratemaking method for risk of construction diversion project
Chen Zhiding,Hu Zhigen
Strategic Study of CAE 2011, Volume 13, Issue 4, Pages 106-112
Based on analyzing risk factors of diversion project, synthetic riskand distribution law of loss were researched on the grounds that foundation pit is submerged after diversioncollective risk model of the total losses about engineering insurance is established on the basis of constructiondiversion project risk.Ultimately, insurance ratemaking method for construction engineering risk and its mathematical expression
Keywords: diversion risk engineering insurance insurance premium non-homogeneous compound Poisson process
Intelligent construction technology of railway engineering in China
Chunfang LU, Junfei LIU, Yanhong LIU, Yuming LIU
Frontiers of Engineering Management 2019, Volume 6, Issue 4, Pages 503-516 doi: 10.1007/s42524-019-0073-9
Keywords: China railway sector intelligent construction railway engineering informatization development stage
Flutter stability and management strategy for the deck of Taizhou Bridge during construction stage
Li Chengcheng,Chen Airong and Ma Rujin
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 46-50
Keywords: multi tower suspension bridge construction stage flutter stability management strategy
Li Boheng
Strategic Study of CAE 2003, Volume 5, Issue 5, Pages 19-23
The south-north water project have been listed in the Tenth Five-Year Plan. Recently the east line and middle line in this project have been ready to start working. In order to change the status of lacking water in north of China, this paper discusses the necessity and the feasibility of diverting water from the southwest trunk rivers with the digital earth virtual technique, including the amount of water diverted, the geologic bedrock, the optimum line of diverting water and the impact on entironment.
Keywords: water diversion virtual methodology Western China
Stress observation of shaft lining wall during construction and initial operation
Wen Dehua
Strategic Study of CAE 2012, Volume 14, Issue 2, Pages 80-84
Keywords: shaft lining monitoring thick topsoil strain additional force
A DSS for Management on the Jointly Discharging of Overtopped Cofferdam
Fang Debin,Wang Xianjia,Hu Zhigen
Strategic Study of CAE 2003, Volume 5, Issue 1, Pages 62-68
Management on the jointly discharging of overtopped cofferdam is a typical semi-structured problem. So a decision support system is designed to address the management on the jointly discharging of overtopped cofferdam. This paper introduces systematically the structural framework, design principle, decisionmaking mode, and fundamental function of CDDSS. The system consists of four components: database subsystem, model base subsystem, graphics base subsystem, method base subsystem, and user-interface. A CDDSS is a man-machine interactive system,which integrates computer science and technology with the theory and method of systems science, management science and the theory and method of hydraulic and electric engineering. The case study illustrates that the friendly window-based user interface of the system enables the decision maker/user to take full advantage of the capabilities of the system in order to make effective real-time decisions.
Keywords: overtopped cofferdam construction diversion management decision support system (DSS)
Yifu ZHANG,Hongwen LI,Jin HE,Qingjie WANG,Ying CHEN,Wanzhi CHEN,Shaochun MA
Frontiers of Agricultural Science and Engineering 2016, Volume 3, Issue 2, Pages 161-170 doi: 10.15302/J-FASE-2016104
Keywords: infiltration initial soil water content rainfall simulation soil loss straw mulching
Water Diversion is Not to Blame for Phosphorus Enrichment in Taihu Lake
Zhiyuan Wang,Qiuwen Chen,Jianyun Zhang,Hanlu Yan,
Engineering doi: 10.1016/j.eng.2023.07.007
Shu CHEN, Menghan SHANG, Jianping WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 1, Pages 135-147 doi: 10.1007/s42524-020-0125-1
Keywords: vertical ship lift initial fire fire evacuation numerical simulation stair elevator
Initial stiffness and moment resistance of reinforced joint with end-plate connection
Sufang WANG, Yiyi CHEN,
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 4, Pages 345-351 doi: 10.1007/s11709-009-0054-x
Keywords: steel structure end-plate connection backing plate supplementary web plate initial stiffness moment resistance
Title Author Date Type Operation
Multi-objective Risk Model of Optimal River Diversion Standards During Initial Stage Construction for
Hu Zhigen,Liu Quan,He Changhal,Xiao Huanxiong,Zhou Yihong,Fu Zheng,Li Dingkui
Journal Article
The South-to-North Water Diversion Project
Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC
Journal Article
Whole construction process real-time schedule control and visual analysis of the long distance diversion
Hu Lianxing,Tong Dawei,Jiao Kai
Journal Article
Brief description of project plan justification during the initial stage for main bridge of Sutong Bridge
Wu Shouchang, Xu Yingmei
Journal Article
The construction design and practice of Three Gorges Project
Wen Yonghong,Xie Xiangrong,Fan Wuyi
Journal Article
Insurance ratemaking method for risk of construction diversion project
Chen Zhiding,Hu Zhigen
Journal Article
Intelligent construction technology of railway engineering in China
Chunfang LU, Junfei LIU, Yanhong LIU, Yuming LIU
Journal Article
Flutter stability and management strategy for the deck of Taizhou Bridge during construction stage
Li Chengcheng,Chen Airong and Ma Rujin
Journal Article
Methodological Approach on Virtual Simulation for Water Diversion from South to North in Western China
Li Boheng
Journal Article
Stress observation of shaft lining wall during construction and initial operation
Wen Dehua
Journal Article
A DSS for Management on the Jointly Discharging of Overtopped Cofferdam
Fang Debin,Wang Xianjia,Hu Zhigen
Journal Article
Effect of mulching with maize straw on water infiltration and soil loss at different initial soil moistures
Yifu ZHANG,Hongwen LI,Jin HE,Qingjie WANG,Ying CHEN,Wanzhi CHEN,Shaochun MA
Journal Article
Water Diversion is Not to Blame for Phosphorus Enrichment in Taihu Lake
Zhiyuan Wang,Qiuwen Chen,Jianyun Zhang,Hanlu Yan,
Journal Article
Evacuation strategies for vertical ship lift during initial fire: Integrated application of stairs and
Shu CHEN, Menghan SHANG, Jianping WANG
Journal Article